This project was a stainless steel chute that we designed and fabricated to install at the Bradenton Reclamation Plant. Stainless steel was used so that it does not corrode. The original chute was only installed for about 10 years and they had to replace it. The first picture is of the original chute. The next two pictures are of the replacement we made and installed.
We also built the aluminum staircase at our shop and then installed it onsite.