Sign
We cut the sign loose, lifted it up, cut off, and then put it back down and welded it up.
View More InfoWe cut the sign loose, lifted it up, cut off, and then put it back down and welded it up.
View More InfoWe welded and cleaned up the corner of the handrail at the bottom of this spiral staircase.
View More InfoThis was for Sutter Roofing. Owner Adam Seidon says “What I love about this is I’m 6 stories above the ground working on this!”
View More InfoThe beams were all rotting out from the ground level down. We had to cut into the asphalt, dig down into it, cut away the bad metal and replace it with new metal.
View More InfoA hurricane took away all of the railing that was on this pier. We replaced all of it with stainless steel cable railing.
View More InfoGates fabricated and installed for The Rum Barrel. In the last picture, the panels were made and installed to hide all of the equipment behind the restaurant.
View More InfoCroci is a manufacturer in Fort Myers. They wanted a commercial gate installed. BFT, a gate operator manufacturer, recommended us to build and install the gate operators. This gate is a 32-foot span. This is of big significance because not many gates can go 32 feet. There are two 16-foot leafs and that is a lot […]
View More InfoThis project was a stainless steel chute that we designed and fabricated to install at the Bradenton Reclamation Plant. Stainless steel was used so that it does not corrode. The original chute was only installed for about 10 years and they had to replace it. The first picture is of the original chute. The next two pictures […]
View More Info